- Joined
- Mar 26, 2004
- Messages
- 1,617
This is a piece I shipped today for a good customer in the US.
Some Process Pics
A flat piece of cable damascus for the butt of each arm of the handle, along with a 7/32" threaded tubing.
Welding both pieces together with bronze.
Welded resulting piece.
Threading the tang.
Holes on the stag. The tang length must be exact to top on the inner wall of the stag once positioned in place.
Some Process Pics
A flat piece of cable damascus for the butt of each arm of the handle, along with a 7/32" threaded tubing.


Welding both pieces together with bronze.

Welded resulting piece.

Threading the tang.


Holes on the stag. The tang length must be exact to top on the inner wall of the stag once positioned in place.

