Busse Time Slowdown

UNRL Ghandi

Gold Member
Joined
Oct 24, 2013
Messages
987
Robdude got me thinking in the below post about how time does slow down when we're waiting for our shipping notices after the initial ding.

I swear Busse has figured out how to slow time...
Tick tock tick tock.. ding!! "We will email you when your knife has shipped " ....t i c k...........t o c k.........t i c k............t o c k.............

So I figured up a mathematical formula to determine the Busse Time Slowdown.

AB = Awesomeness of the Blade on a scale from 1 to 10
NAF = Normal Anticipation Factor on a scale from 1 to 10 (represents how you normally react to fun things you have to wait for)
WTF = Wait Time Factor (kind of like a wind chill factor but for wait time)
BTS = Busse Time Slowdown

The Formula
(AB x 10) + (NAF x 5) = WTF
WTF / 2 weeks = BTS

For the FMV8 Nukes my BTS is 92.5 weeks!!! So this wait time literally feels like 1.8 years. :eek::eek::eek:

My math:
AB = 15 (yes the AB on this one is off the charts) :D
NAF = 7 (I get pretty anxious but not too crazy)

(15x10)+(7x5) = 185 Wait Time Factor
185 / 2 weeks = 92.5 weeks of BTS

Yes, I know I'm a nerd. :thumbsup:
 
Robdude got me thinking in the below post about how time does slow down when we're waiting for our shipping notices after the initial ding.



So I figured up a mathematical formula to determine the Busse Time Slowdown.

AB = Awesomeness of the Blade on a scale from 1 to 10
NAF = Normal Anticipation Factor on a scale from 1 to 10 (represents how you normally react to fun things you have to wait for)
WTF = Wait Time Factor (kind of like a wind chill factor but for wait time)
BTS = Busse Time Slowdown

The Formula
(AB x 10) + (NAF x 5) = WTF
WTF / 2 weeks = BTS

For the FMV8 Nukes my BTS is 92.5 weeks!!! So this wait time literally feels like 1.8 years. :eek::eek::eek:

My math:
AB = 15 (yes the AB on this one is off the charts) :D
NAF = 7 (I get pretty anxious but not too crazy)

(15x10)+(7x5) = 185 Wait Time Factor
185 / 2 weeks = 92.5 weeks of BTS

Yes, I know I'm a nerd. :thumbsup:

So yer sayin' all we have to do is install a flux capacitor in Garth's grinder and get it up to 80k RPM, and BOOM! the Nukes will ship?!??? :p
 
Back
Top