cj65
Gold Member
- Joined
- Aug 30, 2008
- Messages
- 36,474
I have been at this digburn wall since about October. Foundation is about 18" deep. The wall is grouted with concrete and filled with rebar. Can you tell my dad was a structural engineer? I worked on it weekends primarily, in between church, errands, laundry, other general repairs and such. I am sure my neighbors are tired of my dirt front. I sprayed it all with Roundup and want to start from scratch. I should be planting this summer and fall. So, back to the wall, my neighbor wanted to know if I wanted to do something other than an old rotting out railroad tie for a property divider. I said sure, how about if I build us a wall out of slumpstone tan colored cinder block. We split the cost of the materials 50 50, and the only thing I ask is that you do not sweat me on a finishing date. I like to stay at home, but the wife likes to go out and do fun things. I am a boring ol coot, who would rather hang out in my man cave and fix stuff, or slap some scales on knife blanks. So, finally getting close to finishing this wall. I am kinda proud of it. Thanks for looking. I will be capping it off with a dark brown bullnose. I will post pics then too. The downlights are 12 watt fixtures 2 bulbs per fixture and made by Vista. They are located in my home town Simi Valley CA
Have a great weekend all.



Have a great weekend all.