- Joined
- Nov 13, 2004
- Messages
- 878
Here is a copy of a thread at the spyder forum posted by Sal Glesser regarding the much anticipated Delica 4 in ZDP.
"The "numerous" schedules are the result of getting the steel. Apparently Hitachi's lead time is long and inconsistent.
The first change, (from the Delica3 to the Delica4 format), slowed down the process some 6 months.
The Emerson "waves" should be shipping soon (they're here). I expect the ZDP Delica to be here very soon.
They are all sold out from our end. Anyone that is getting them already has them ordered.
sal
"
It would appear that if you didn't pre-order or get on a waiting list, you may have a hard time finding them. He states that Spyderco has already sold out what they are making.
"The "numerous" schedules are the result of getting the steel. Apparently Hitachi's lead time is long and inconsistent.
The first change, (from the Delica3 to the Delica4 format), slowed down the process some 6 months.
The Emerson "waves" should be shipping soon (they're here). I expect the ZDP Delica to be here very soon.
They are all sold out from our end. Anyone that is getting them already has them ordered.
sal
"
It would appear that if you didn't pre-order or get on a waiting list, you may have a hard time finding them. He states that Spyderco has already sold out what they are making.