- Joined
- Jun 21, 1999
- Messages
- 752
Well, after thinking about it for the past three years, I have started on a two car carage/hot shop. Its going to be 24x24 with a gable roof and a 12x24 loft.
Got my holes dug last week by a guy with an auger on a skidster. Two out of twelve went smoothly. The rest were like drilling in a creek bed, which is apparently what got used as fill in this lot. Just got done doing the hand digging to get them cleaned out and ready for the poles. I've got twelve pressure treated 6x6x14' posts that I hope to get in this weekend.
The lumber guy is bringing my first load of rough cut 2x8s tomorrow so hopefully this weekend I will have a little something sticking out of the ground to take pics of.
This is my first attempt at building a building. Wish me luck, I'm gonna need it!
Ed
Got my holes dug last week by a guy with an auger on a skidster. Two out of twelve went smoothly. The rest were like drilling in a creek bed, which is apparently what got used as fill in this lot. Just got done doing the hand digging to get them cleaned out and ready for the poles. I've got twelve pressure treated 6x6x14' posts that I hope to get in this weekend.
The lumber guy is bringing my first load of rough cut 2x8s tomorrow so hopefully this weekend I will have a little something sticking out of the ground to take pics of.
This is my first attempt at building a building. Wish me luck, I'm gonna need it!
Ed