Robdude
Gold Member
- Joined
- Feb 27, 2015
- Messages
- 2,577
Particularly with the whole operation 2 weeks... as new blades have been released, we all cheer or get bummed cause the blade we wanted was not released... that's fine but when we look at the number of different blades offerd in the last 4 months.. and the # of blades they have committed to build... I have worked in a metal shop.. an I it's not always a walk in the park, when 800 things depend on the next.. $hit goes haywire a lot!! Busse does an incredible job keeping stuff moving (an this is this the key) WITHOUT SACRIFICING QUALITY AND ATTN TO DETAIL)
Hats of to Lexi, Jerry, Pokey1, Garth, Beef, an everyone at Busse!!!
Hats of to Lexi, Jerry, Pokey1, Garth, Beef, an everyone at Busse!!!
Last edited: