- Joined
- Dec 24, 2005
- Messages
- 1,254
My new grinder arrived today,(thanks rob) Now it's all painted and ready to rock..I have a few pic's of my workshop.. The 1st 2 are the leather work and planning area, Then the drill press + tempering oven, assembly area, welding area, new grinder & portaband, Anvil and forge, other grinders, forge again, and KMG V/S set up (the grey box is a 60amp airconditioner power switch to turn the VFD on/off) I still need a heat treat oven or a pyrometer for the forge so I can heat treat correctly.. thanks for looking..