- Joined
- Oct 3, 2007
- Messages
- 36
Ok, first thing is first. I'm trying to figure some basics out before getting to deep into the planning phases.
The main thing I need help with is as follows (per the manual):
The motor speed is 1725 rpm,arbor size 5/8 inch with a speed of 1750 rpm, and it comes standard with an 8 inch contact/drive wheel, which gives a belt speed of 3600 feet per minute. I'm completly stumped on how to figure out what the belt speed would be with swapping out the 8 inch drive wheel with a standard 4 inch drive wheel. Would the speed be faster or slower with the smaller wheel?
Any help would be appreciated.
The main thing I need help with is as follows (per the manual):
The motor speed is 1725 rpm,arbor size 5/8 inch with a speed of 1750 rpm, and it comes standard with an 8 inch contact/drive wheel, which gives a belt speed of 3600 feet per minute. I'm completly stumped on how to figure out what the belt speed would be with swapping out the 8 inch drive wheel with a standard 4 inch drive wheel. Would the speed be faster or slower with the smaller wheel?
Any help would be appreciated.