- Joined
- Jun 22, 1999
- Messages
- 67
Hi guys,
I expect to be able to take at least several days (hopefully more) off from my engineering work sometime within the next 2 weeks. If I can get several days back to back, I can get the last of the knives finished to the point where I can get them to the finisher. I'll update you as soon as I know more.
Taking this engineering job has reminded me why I wanted to make knives. The cost in stomach lining has been high.
Thanks for your patience,
Bob Couture, the old (and getting older by the minute) engineer
I expect to be able to take at least several days (hopefully more) off from my engineering work sometime within the next 2 weeks. If I can get several days back to back, I can get the last of the knives finished to the point where I can get them to the finisher. I'll update you as soon as I know more.
Taking this engineering job has reminded me why I wanted to make knives. The cost in stomach lining has been high.
Thanks for your patience,
Bob Couture, the old (and getting older by the minute) engineer