Are kiln cooling/reheat times factored into soak times for hardening steel?

Joined
Feb 3, 2010
Messages
201
My electric kiln cools down a couple hundred degrees every time I open the door to put in a knife and it probably takes a little under 10 minutes or so to get back up to temperature. If I'm trying to harden some 1095 at 1500F should I quench after 10 minutes when the blade has probably only been at 1500 for a couple minutes or should I only start the soak time once the oven has fully come up to temperature (with the knife in it).
 
Start soak time when the blade reaches 1500,once my kiln reaches 1500 I soak for 10 min.
Stan
 
As Stan said, the time at the target temp is the soak time. Ramp and cool times are not part of that.
 