- Joined
- Feb 10, 2010
- Messages
- 106
I'm putting this down for a floor in my forge. This is my first time using mizzou and it doesn't look right. I mixed it to a dry mixture because instructions say don't use any more than %11 water. When I put it down it seemed like it was awfully loose and full of pebbles, will this harden up to a tough floor or do I need to start over. Also how I built my forge my floor can only be around 1/4" is this too shallow for mizzou? Thanks guys.