Despite all my calculations and thinking I had more than enough of my refractory cement mix I came up short by almost a third. I covered the exposed top with some moist paper towels and set the kit in the boiler room to set up.
The forge length is 15.5" and I got about 11" packed with cement. Can I just get some more cement on Monday and carry on where I left off or are there special considerations? Should I wait till my Satanite arrives and use some like a mortar in the joint?
Here's a couple pics for the curious.
Yes, it is a hacked up 23 Litre pail that's been resized to ~9.5" diameter... and it really sucks welding a 1/4" wall pipe to that thin steel pail.


The forge length is 15.5" and I got about 11" packed with cement. Can I just get some more cement on Monday and carry on where I left off or are there special considerations? Should I wait till my Satanite arrives and use some like a mortar in the joint?
Here's a couple pics for the curious.
Yes, it is a hacked up 23 Litre pail that's been resized to ~9.5" diameter... and it really sucks welding a 1/4" wall pipe to that thin steel pail.