Piers are in, concrete to be poured next week.
The ground water level is pretty high as we are next to the Windriver, so the foundation is anchored with 12-15‘ steel piers on top of the bed rock. The wet spot in the back is where the pier drill hit a water pipe coming from the well (back, left of garage window).