- Joined
- Dec 7, 2009
- Messages
- 6,642
The BladeForums.com 2024 Traditional Knife is ready to order! See this thread for details:
https://www.bladeforums.com/threads/bladeforums-2024-traditional-knife.2003187/
Price is $300 $250 ea (shipped within CONUS). If you live outside the US, I will contact you after your order for extra shipping charges.
Order here: https://www.bladeforums.com/help/2024-traditional/ - Order as many as you like, we have plenty.
Worse than the data guys are freaking camera /av geeks and it looks like they have been there too!View attachment 2422914
Data guys….
They go in an update these systems and never remove any of the old stuff in the ceiling. We have low voltage inspections now luckily.Worse than the data guys are freaking camera /av geeks and it looks like they have been there too!
YEP! Don’t you just love to lift a tile and find 10 lbs of crap in a 5 lb bag! Get this, The JHA here only inspects LV if an Electrical Contractor puts it in as part of a city approved plan. The idiots pulling data comm / av out of their moms station wagon off permit have no over site even if on the same job as sparky!They go in an update these systems and never remove any of the old stuff in the ceiling. We have low voltage inspections now luckily.
same here mostly, if there’s not a building or electrical inspection happening most of the time the LV guys will fly right by. They do have to be included under our permit and I don’t mind doing it when I know they’ll be inspected and have to do it right. I will say the data guys who did the two gas stations we did this year were some of the best I’ve seen and had to work with. We still did all the slab and underground for them, mounted boxes and stub ups, which is normal but they did a really nice jobYEP! Don’t you just love to lift a tile and find 10 lbs of crap in a 5 lb bag! Get this, The JHA here only inspects LV if an Electrical Contractor puts it in as part of a city approved plan. The idiots pulling data comm / av out of their moms station wagon off permit have no over site even if on the same job as sparky!