Nathan the Machinist
KnifeMaker / Machinist / Evil Genius
Moderator
Knifemaker / Craftsman / Service Provider
- Joined
- Feb 13, 2007
- Messages
- 15,653
I like to have two pre-orders going at a time so one is ramping up while the other is shipping, and (if we're going to do one) it is probably once again time for our next pre-order.
I'm not gunna lie, I was going to do a ~20" Nottakatana and y'all were going to lose your collective minds because it was going to be another dope-as-hell collaboration but after that K18 I need a break from that. It would have been good because I like to have a large project to run alongside a small project but the only other large project in the works right now would be the kukri but that isn't ready for prime time yet.
I think it's time to take a look at ramping up the DEK2 and the DEK3 and maybe do a re-release of the DEK1 while we're at it. Obviously, we're going to run Delta 3V, and I'm thinking we'll also probably run some Magnacut. Maybe Cruwear too? Idunno. I haven't really optimized either of those yet and I may be putting the cart ahead of the horse.
Whatever we do, I'm going to have materials made for the project so we need to get something on order soon because we're seeing a lot of delays these days and I don't want to be sitting on my hands in six months waiting on materials to arrive.
Thoughts? Opinions?
I'm not gunna lie, I was going to do a ~20" Nottakatana and y'all were going to lose your collective minds because it was going to be another dope-as-hell collaboration but after that K18 I need a break from that. It would have been good because I like to have a large project to run alongside a small project but the only other large project in the works right now would be the kukri but that isn't ready for prime time yet.
I think it's time to take a look at ramping up the DEK2 and the DEK3 and maybe do a re-release of the DEK1 while we're at it. Obviously, we're going to run Delta 3V, and I'm thinking we'll also probably run some Magnacut. Maybe Cruwear too? Idunno. I haven't really optimized either of those yet and I may be putting the cart ahead of the horse.
Whatever we do, I'm going to have materials made for the project so we need to get something on order soon because we're seeing a lot of delays these days and I don't want to be sitting on my hands in six months waiting on materials to arrive.
Thoughts? Opinions?