M2 is done in the last batch. I have A2 coming. I already cut out the 15n20, and CFV is already tested. I think Kuraki was doing the M4. The aeb-l I ordered arrived today to see how much toughness drops off with higher hardness.
If you can spare enough 3v for 12 coupons at 10mmx55mmx0.100” thick, that would be great. I’ll pay for it, plus shipping. I plan to do four hardnesses from Rc58-Rc62/63. I need three coupons for each condition (12 in total) but I can cut them out from a solid bar as long as there is enough steel.